Latest News
-
Darwin Transition Pontoon Supply and Installation Jan 2014
The Ichthys LNG plant and associated facilities, including the Accommodation Village at Howard Springs, are being built by JKC Australia LNG Pty Ltd on behalf of INPEX in joint venture with major participant Total and Tokyo Gas, Osaka Gas, Chubu Electric and Toho Gas.
Read more ... -
New Cyclone Moorings - Dampier December 2013
Jeyco was recently awarded the contract for the supply, installation and certifcation of two new moorings in Dampier for a Gorgon supply barges.
Read more ...
Home : Catalogues
Catalogue
Catalogue Sections
- Heavy Lift
- Moorings
- Fibre Rope
- Rope Terminations and Accessories
- Anchors
- Chain and Fittings
- Buoys and Markers
- Fendering
- Deck Fittings and Wharf Furniture
Anchors
- AC14 HHP
- Clump Weights / Sinkers
- Danforth Anchor
- Delta
- Halls Stockless
- Pool Anchor
- Stevpris Mk 5
- Stevpris Mk 6
- Stevshark
- Stingray
Chain
- Chain Size and Configurations (PDF)
- Chain Sizing and Link Configuration (PDF)
- Grade 2 Studlink Specs
- Grade 3 Studlink Specs (PDF)
- Studless Chain Specs (PDF)
- Offshore Grade Chain Specs (PDF)
Rope
- Akwaflex (PDF)
- Nylon Double Braid (PDF)
- Polyester Double Braid Info Sheet (PDF)
- Polypropelene Rope (PDF)
- Plasma 12 Strand (PDF)
- Plasma 12x12 (PDF)
Jewellery and Fittings
- Anchor 'D' Type Joining Shackle (PDF)
- 'D' Type Joining Shackle (PDF)
- Green Pin Bow Shackles (PDF)
- Kenter Type Connecting Link (PDF)
- Jaw-Jaw Swivel (PDF)
- Swivel Forerunner Assembly (PDF)
- Mooring Rings (PDF)
- Pear Shape Connecting Links (PDF)
- Tri-Plates (PDF)